What Goes Into Our Concrete
Driveways
4,000 PSI concrete poured at a 4” depth over a 2–4” compacted aggregate base.
Walkways and Patios
Finished concrete walkways and patios are 4,000 PSI concrete, 4” thick.
Reinforcement
6” x 6” welded wire mesh in every driveway, walkway and patio; #4 rebar only where a new driveway ties into an existing garage slab.
Joints
Control joints cut every 8–10 feet, and expansion joints for temperature movement.

What Should You Ask a Concrete Contractor?
Start with the license. In Virginia, any contractor’s license can be checked with the Department of Professional and Occupational Regulation (DPOR); ours is Virginia Class A license #2705118509.
Then ask what you are paying for: how deep the stone base is and what stone it is, how thick the concrete is and its PSI, whether the slab gets wire mesh and how it ties into the garage, where the control joints go, and what the warranty does and does not cover, especially hairline cracks and salt damage.
Our guide to hiring a concrete contractor in Virginia has the full list of questions and what a fair bid includes.
What Does PSI Mean for Concrete?
PSI, pounds per square inch, is the compressive strength concrete reaches once it has cured, usually measured at 28 days. The higher the number, the more load the slab can carry and the better it stands up to wear.
Every finished concrete surface JP Companies pours, from driveways to walks and patios, is 4,000 PSI concrete. That is a common strength for residential driveways that see daily traffic and Northern Virginia winters.
How Long Does Concrete Take to Cure?
Concrete keeps curing for weeks: it reaches most of its design strength in about 28 days, and gains strength fastest in the first week. Curing is a chemical reaction, not simple drying, which is why new concrete is kept damp rather than left to bake.
In practice, a new slab can take foot traffic after 24 hours and a car after 7–10 days. In warmer months, misting the surface for 3–5 minutes twice a day helps it cure evenly.
The Understanding Concrete guide covers curing, hairline cracks and the first winter.
Why Does New Concrete Have Lines Cut Into It?
The lines cut across new concrete are control joints, and they are there on purpose. Concrete shrinks slightly as it cures and moves with the seasons, so it will crack somewhere; a joint gives that crack a straight, planned place to happen, hidden at the bottom of the cut.
Joints that are too far apart let cracks wander across the open slab. On a JP Companies driveway they are cut every 8–10 feet.
Concrete for Communities and Light Commercial Work
For HOAs, townhouse communities, clubs and wineries, JP Companies also builds sidewalks, curb and gutter, shared driveways and paths through Signature Community Scapes, its community work.
Our Concrete Work
-

Concrete Driveway Replacement
Old driveway out, new concrete in, usually in one to two days on site. -

Concrete Walkways
New and replacement walkways from the driveway to the front door. -

Concrete Patios
Scored, stamped and exposed aggregate patios, 4” of 4,000 PSI concrete with wire mesh. -

Community & Commercial Concrete
Sidewalks, curb and gutter, shared driveways and paths for HOAs and communities.
Frequently Asked Questions
How soon can new concrete be used?
Pedestrian traffic is safe after 24 hours. Please wait 7–10 days before driving on a new driveway.
Will new concrete crack?
All concrete expands and contracts. Control joints manage that movement; minor hairline cracks may occur in 10–20% of pours and show the joints are working.
How do I check a contractor’s license in Virginia?
Search the contractor’s name or license number on the Virginia Department of Professional and Occupational Regulation (DPOR) website. JP Companies is licensed as Virginia Class A contractor #2705118509.
What does 4,000 PSI concrete mean?
4,000 PSI concrete reaches a compressive strength of 4,000 pounds per square inch once cured. JP Companies uses it for every finished concrete surface.
How long does concrete take to fully cure?
It reaches most of its design strength in about 28 days. Foot traffic is fine after 24 hours; wait 7–10 days to drive on a new driveway.
Have a Concrete Project in Mind?
Driveway, walkway, patio or community work: tell us what you need and we will set up a visit.

