Who replaces concrete driveways in Fairfax County, VA?
JP Companies, Inc., a Virginia Class A contractor (#2705118509), family-owned since 2007 with its shop in Centreville, takes concrete driveway work across Fairfax County, from Centreville, Chantilly and Clifton to Fairfax, Reston and Herndon. The old asphalt or concrete is hauled away, and the new driveway is 4,000 PSI concrete at a 4” depth over a compacted stone base, usually in one to two days on site. Our Springfield asphalt to concrete driveway is a recent Fairfax County job.
Driveways, Walkways and Steps in Fairfax County
In Fairfax County we take driveway replacements, often with a new walkway to the front door at the same visit. We remove and haul away the old asphalt or concrete, prepare the sub-grade and pour 4,000 PSI concrete at a 4” depth over a compacted stone base.
See how a concrete driveway replacement is built, step by step.
What we take on in Fairfax County:
- Concrete driveway replacement
- Driveway widening and expansion
- Concrete walkways
- Flagstone walkways on a concrete base
- Stone front steps and stoops
- Concrete, paver and stone patios

Why Fairfax County Homeowners Call JP Companies
JP Companies is a family-owned and operated masonry and concrete contractor, in business since 2007, with a Virginia Class A contractor license.
- Miss Utility called before any digging
- Driveway layout marked with you first
- 4,000 PSI concrete at a 4” depth
- Control joints every 8–10 feet
- Debris hauled away at the end
Towns We Serve in Fairfax County
Closest to our shop are Centreville, Chantilly and Clifton.
We also take work in Fairfax, Fair Oaks, Fair Lakes, Oakton, Vienna, Burke, Fairfax Station, Herndon, Reston and Great Falls.

Planned for Fairfax County Winters
Freeze-thaw cycles and road salt are hard on concrete. A standard driveway gets expansion joints and a slip-resistant broom finish; stamped and exposed aggregate finishes are options.
Keep salt and chemical de-icers off new concrete; play sand or kitty litter works for traction.
Permits in Fairfax County
Fairfax County names three towns, Clifton, Herndon and Vienna. The county’s Land Development Services issues building permits and land disturbance permits, and inside the Town of Clifton the town’s own approvals come first, with the county still issuing the building permit.
Driveways and on-grade patios
The county lists driveways and on-grade concrete and paver patios among the home projects that need no building permit, with a note that a project’s size and location can call for other approvals.
Front porches and stoops
A new front porch or stoop is an addition on the county’s list, and it needs a building permit.
Floodplains and Resource Protection Areas
An improvement on a lot in a floodplain or a Resource Protection Area may need separate county approval.
Larger disturbed areas
Land-disturbing work of 2,500 square feet or more needs an approved site-related plan before it starts, counted with a 10-foot work zone around the project.
Front-yard paving
On single-family detached lots up to 36,000 square feet, the Zoning Ordinance limits paving to 25 percent of the front yard in the R-1 and R-2 districts and 30 percent in R-3 and R-4.
Why Do the Base and the Slope Matter?
A driveway can crack when the ground under it moves, and when the ground under a slab moves every season, the slab moves with it. That is one reason the base matters as much as the concrete: JP Companies lays 2–4” of compacted 21A or 57 stone under its driveways before any concrete goes in, and control joints every 8–10 feet guide where the concrete cracks.
Water is the other half. The county says private drainage systems, from driveway culverts to downspouts, and groundwater are the property owner’s responsibility, so a replacement is the time to set the slope so rain runs away from the house.
When Is It Time to Replace an Older Driveway?
If an older driveway is cracked through, sinking or flaking, it may be time to replace it; a new JP Companies driveway typically lasts 25–30 years with standard homeowner care.
Replacement is also the moment to fix what never worked: a driveway too narrow for two cars, a walk that floods at the door, or a front step that sits too high. Widening the driveway or rebuilding the walk can be planned with the replacement, while the old concrete is already coming out.
How Does Road Salt Damage Concrete in Fairfax County Winters?
Road salt damages concrete by making the freeze-thaw cycle worse. Water soaks into the surface, freezes, expands and pushes outward; salt adds more water and more cycles, and the top layer can start to flake, which is called scaling or spalling.
Road salt also arrives on your car and drips off in the driveway. Using play sand or kitty litter instead of salt is the care we recommend; salt and chemical de-icers void the warranty on new concrete.
Frequently Asked Questions
How long does a driveway replacement take in Fairfax County?
Usually one to two days on site. You can walk on new concrete after 24 hours; wait 7–10 days before driving on it.
Do you widen or expand existing driveways?
Yes. See driveway widening and extensions for the ways a driveway is made bigger.
How long does a new concrete driveway last?
With standard homeowner care, a new JP Companies driveway typically lasts 25–30 years.
Which parts of Fairfax County do you serve?
We take work in Centreville, Chantilly, Clifton, Fairfax, Fair Oaks, Fair Lakes, Oakton, Vienna, Burke, Fairfax Station, Herndon, Reston and Great Falls.
Does a driveway replacement need HOA approval in Fairfax County?
It can. Associations such as Little Rocky Run review exterior changes, so check with your HOA before the layout is final.
Start With a Free Estimate
Tell us about your driveway, walkway or steps and we will set up a time to look at it with you.
Call (703) 327-7007 or send the form below.




